1. 91视频下载安装,91视频破解版,91视频下载大全,91视频软件APP下载

     歡迎訪問濟南91视频下载安装超聲波設備有限公司網站!

    專注生產工業用91视频破解版

    讓工業清洗無難事

    電話

    業務谘詢電話:

    18663767799

    你所在位置: 首頁-新聞動態-常見問題CNC高壓清洗機在作業前後的安全要求
    常見問題

    CNC高壓清洗機在作業前後的安全要求

    作者:admin來源:http://www.bolomie.com/時間:2023-03-17

    (1)、作業前準備
    (1) Preparation before operation
    ①、檢查CNC高壓清洗機附件,看是否有鬆動情況
    ① Check the accessories of the CNC high-pressure cleaning machine for looseness
    ②、檢查進水口管路連接,確保水路暢通。
    ② Check the connection of the water inlet pipeline to ensure that the waterway is smooth.
    ③、檢查並確認CNC高壓清洗機控製麵板的主開關切換在“停”的位置。
    ③ Check and confirm that the main switch on the control panel of the CNC high-pressure cleaning machine is switched to the "Stop" position.
    ④、檢查進行主電源接線並接線正確。
    ④ Check that the main power supply wiring is correct.
    ⑤、檢查打開進水管閥門,確保無泄漏。
    ⑤ Check and open the water inlet pipe valve to ensure there is no leakage.
    (2)、作業過程中安全注意事項
    (2) Safety precautions during operation
    ①、嚴禁將清洗噴槍指向人、動物、精密機械、電器設備、CNC高壓清洗機本體、有害物質,避免有害物質飛濺傷
    ① It is strictly prohibited to point the cleaning spray gun at people, animals, precision machinery, electrical equipment, CNC high-pressure cleaning machine body, and hazardous substances to avoid splashing injuries caused by hazardous substances
    ②、嚴禁使用CNC高壓清洗機進行衝洗衣物、鞋等與工作內容無關的操作。
    ② It is strictly prohibited to use CNC high-pressure washing machines to wash clothes, shoes, and other operations unrelated to the work content.
    CNC高壓清洗機
    ③、CNC高壓清洗機停止使用時,控製麵板主開關須切換到“停”的位置並斷開主電源。CNC高壓清洗機嚴禁離人使用
    ③ When the CNC high-pressure cleaning machine is stopped, the main switch on the control panel must be switched to the "Stop" position and the main power supply disconnected. CNC high-pressure cleaning machine is strictly prohibited from use
    ⑤、嚴禁在CNC高壓清洗機作業時移動CNC高壓清洗機,若想移動,必在必在主電源斷電後或控製麵板主開關切換到“停”的位置後進行。
    ⑤ It is strictly prohibited to move the CNC high-pressure cleaning machine during operation. If you want to move the CNC high-pressure cleaning machine, you must do so after the main power supply is powered off or the main switch on the control panel is switched to the "Stop" position.
    ⑥、使用CNC高壓清洗機時必確保地麵幹燥、平坦,防止CNC高壓清洗機翻倒以及CNC高壓清洗機漏電傷人,同時必確保旋轉輪閘已被刹住。
    ⑥ When using the CNC high-pressure cleaning machine, it is necessary to ensure that the ground is dry and flat, to prevent the CNC high-pressure cleaning machine from overturning and electric leakage of the CNC high-pressure cleaning machine, and to ensure that the rotary wheel brake has been stopped.
    ⑦、使用CNC高壓清洗機時雙手必緊握高壓清洗槍,防止高壓反衝力導致的清洗噴槍脫手或清洗噴槍失控等不安全情況的發生。
    ⑦ When using the CNC high-pressure cleaning machine, both hands must hold the high-pressure cleaning gun tightly to prevent unsafe situations such as the release of the cleaning gun or the loss of control of the cleaning gun caused by the high-pressure recoil force.
    ⑧、CNC高壓清洗機的修護工作必在CNC高壓清洗機斷開主電源後並完全冷卻後進行。
    ⑧ The maintenance work of the CNC high-pressure cleaning machine must be carried out after the main power supply of the CNC high-pressure cleaning machine is disconnected and completely cooled.
    ⑨、進行清洗時嚴禁用清洗噴槍上的安全鎖定扭將清洗噴槍扣機鎖定在打開位置。
    ⑨ During cleaning, it is strictly prohibited to use the safety locking knob on the cleaning spray gun to lock the cleaning spray gun buckle in the open position.
    ⑩、當扣動清洗噴槍扣機無水噴出時,嚴禁人員湊近清洗噴槍進行處理。
    ⑩ When the cleaning spray gun is turned on and there is no water spraying from the machine, it is strictly prohibited for personnel to approach the cleaning spray gun for treatment.
    (3)、工作完成後的注意事項
    (3) Precautions after completing the work
    ①、工作完畢後,離開機器前,主電源電線盤起收好。
    ① After completing the work and before leaving the machine, the main power cord should be coiled up and put away.
    ②、關閉進水,拆除進水口管路。
    ② Close the water inlet and remove the water inlet pipeline.
    ③、扣動清洗噴槍扣機清空餘水。
    ③ Press the cleaning spray gun to empty the residual water.
    ④、將高壓清洗管盤起,收好,避免折
    ④ Coil up the high-pressure cleaning tube and put it away to avoid folding
    ⑤、將CNC高壓清洗機存放在幹淨幹燥的地方,並確保高壓清洗管及主電源電線不受損壞。
    ⑤ Store the CNC high-pressure cleaning machine in a clean and dry place, and ensure that the high-pressure cleaning tube and main power cord are not damaged.
    CNC高壓清洗機在作業前後的安全要求就講解到這裏了,您對此有怎樣的需求或者使用疑惑,歡迎來91视频下载安装網站http://www.bolomie.com谘詢!
    That's all about the safety requirements for CNC high-pressure cleaning machines before and after operation. If you have any requirements or doubts about using them, please come to our website http://www.bolomie.com consulting service
    網站地圖91视频免费网站 91视频下载链接 91视频最新地址 好色先生破解版 91视频网址入口 丝瓜社区在线观看 茄子视频污污污版 香蕉视频污下载 羞羞视频在线观看免费 羞羞的视频网站